| 3/12/2026 | |
10.60
|
4108.66
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/24/2025 | |
8.40
|
4110.86
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/12/2024 | |
10.70
|
4108.56
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/27/2023 | |
11.30
|
4107.96
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/11/2022 | |
12.70
|
4106.56
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/12/2021 | |
10.30
|
4108.96
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/26/2020 | |
6.60
|
4112.66
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/18/2019 | |
7.30
|
4111.96
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/24/2018 | |
5.30
|
4113.96
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/28/2017 | |
6.50
|
4112.76
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/10/2016 | |
10.40
|
4108.86
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/2/2015 | |
10.70
|
4108.56
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/15/2014 | |
11.00
|
4108.26
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/25/2011 | |
7.42
|
4111.84
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 4/24/1978 | |
8.00
|
4111.26
|
DRILLER
|
WELL LOG
| REPORTED | STATIC | |
|
|