3/15/2024 | |
2.80
|
151.20
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/24/2023 | |
2.60
|
151.40
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/18/2022 | |
5.50
|
148.50
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/19/2021 | |
5.00
|
149.00
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/19/2020 | |
5.50
|
148.50
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/22/2019 | |
6.60
|
147.40
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/20/2018 | |
2.30
|
151.70
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/23/2017 | |
0.40
|
153.60
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/11/2016 | |
3.40
|
150.60
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/27/2015 | |
5.40
|
148.60
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/28/2014 | |
3.80
|
150.20
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/21/2013 | |
2.00
|
152.00
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/22/2012 | |
1.30
|
152.70
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/29/2011 | |
0.40
|
153.60
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/11/2010 | |
6.22
|
147.78
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.58 |
3/25/2009 | |
2.52
|
151.48
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.58 |
3/13/2008 | |
5.52
|
148.48
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.58 |
3/14/2007 | |
4.52
|
149.48
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.58 |
6/16/2006 | |
14.00
|
140.00
|
DRILLER
|
WELL LOG
| REPORTED | STATIC | |
|
|