2/22/2019 | 14:25:00 |
80.24
|
494.91
|
OWRD
|
GWATER
| ETAPE | STATIC | 3.10 |
2/10/2016 | 15:40:00 |
82.25
|
492.90
|
OWRD
|
GWATER
| ETAPE | STATIC | 3.10 |
2/17/2015 | 16:50:00 |
81.10
|
494.05
|
OWRD
|
GWATER
| ETAPE | STATIC | 3.10 |
2/13/2014 | 13:49:00 |
81.10
|
494.05
|
OWRD
|
GWATER
| ETAPE | STATIC | 3.10 |
2/20/2013 | 16:31:00 |
80.37
|
494.78
|
OWRD
|
GWATER
| ETAPE | STATIC | 3.10 |
2/14/2012 | 09:01:00 |
79.88
|
495.27
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 3.10 |
12/5/2011 | |
79.71
|
495.44
|
CONSULTANT
|
ASR AR PROJECT
| UNKNOWN | UNKNOWN | 3.29 |
11/3/2011 | |
82.25
|
492.90
|
CONSULTANT
|
ASR AR PROJECT
| UNKNOWN | UNKNOWN | 3.29 |
11/1/2011 | |
82.24
|
492.91
|
CONSULTANT
|
ASR AR PROJECT
| UNKNOWN | UNKNOWN | 3.29 |
10/12/2011 | |
77.66
|
497.49
|
CONSULTANT
|
ASR AR PROJECT
| UNKNOWN | UNKNOWN | 3.29 |
9/28/2011 | |
78.07
|
497.08
|
CONSULTANT
|
ASR AR PROJECT
| UNKNOWN | PUMPING | 3.29 |
9/6/2011 | |
78.38
|
496.77
|
CONSULTANT
|
ASR AR PROJECT
| UNKNOWN | UNKNOWN | 3.29 |
8/1/2011 | |
81.41
|
493.74
|
CONSULTANT
|
ASR AR PROJECT
| UNKNOWN | UNKNOWN | 3.29 |
2/15/2011 | 17:23:00 |
82.12
|
493.03
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 3.10 |
11/1/2010 | 14:27:00 |
90.46
|
484.69
|
OWRD
|
GWATER
| ETAPE CALIBRATED | PUMPING | 3.10 |
10/5/2010 | 08:37:00 |
82.26
|
492.89
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 3.10 |
9/8/2010 | 09:08:00 |
91.32
|
483.83
|
OWRD
|
GWATER
| ETAPE CALIBRATED | PUMPING | 3.10 |
8/3/2010 | 08:53:00 |
90.99
|
484.16
|
OWRD
|
GWATER
| ETAPE CALIBRATED | PUMPING | 3.10 |
7/6/2010 | 14:21:00 |
90.43
|
484.72
|
OWRD
|
GWATER
| ETAPE CALIBRATED | PUMPING | 3.10 |
6/8/2010 | 11:36:00 |
85.61
|
489.54
|
OWRD
|
GWATER
| ETAPE CALIBRATED | PUMPING | 3.10 |
|
|