3/19/2024 | |
220.90
|
1469.10
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.40 |
3/28/2023 | |
220.40
|
1469.60
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.40 |
3/29/2022 | |
276.00
|
1414.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | PUMPING | 2.40 |
3/13/2020 | |
246.80
|
1443.20
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.40 |
3/8/2019 | |
246.30
|
1443.70
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.40 |
3/9/2017 | |
237.90
|
1452.10
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.40 |
3/23/2016 | |
242.90
|
1447.10
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | 2.40 |
3/6/2015 | |
253.80
|
1436.20
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | 2.40 |
3/11/2014 | |
249.90
|
1440.10
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | 2.40 |
3/20/2013 | |
250.70
|
1439.30
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | 2.40 |
4/4/2011 | |
250.00
|
1440.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | 2.50 |
3/22/2010 | |
247.00
|
1443.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.50 |
|
|