3/28/2024 | |
227.08
|
67.92
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | PUMPING | 1.17 |
3/31/2023 | |
165.33
|
129.67
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.17 |
3/24/2021 | |
168.50
|
126.50
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
3/31/2020 | |
170.67
|
124.33
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.58 |
3/26/2019 | |
165.33
|
129.67
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/28/2018 | |
165.00
|
130.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/31/2017 | |
167.75
|
127.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/30/2016 | |
167.08
|
127.92
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | 1.25 |
6/21/2010 | |
|
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|