4/5/2023 | |
48.50
|
342.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
6/18/2021 | |
44.40
|
346.10
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/3/2020 | |
45.00
|
345.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/26/2019 | |
43.00
|
347.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/20/2018 | |
44.60
|
345.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/14/2017 | |
43.00
|
347.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/15/2016 | |
43.75
|
346.75
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/11/2015 | |
44.46
|
346.04
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.84 |
3/10/2014 | |
44.26
|
346.24
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.84 |
3/12/2013 | |
43.66
|
346.84
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.84 |
3/12/2012 | |
43.66
|
346.84
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.84 |
12/13/2007 | |
43.00
|
347.50
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|