| 3/16/2026 | |
151.25
|
1038.75
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.58 |
| 3/19/2021 | |
153.70
|
1036.30
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.70 |
| 3/28/2013 | |
152.08
|
1037.92
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 4/5/2012 | |
151.50
|
1038.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | |
| 3/29/2011 | |
152.17
|
1037.83
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | |
| 4/14/2010 | |
151.33
|
1038.67
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | |
| 10/17/2008 | |
153.00
|
1037.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|