3/11/2024 | |
172.30
|
4152.70
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/3/2023 | |
173.60
|
4151.40
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/16/2022 | |
175.20
|
4149.80
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/12/2020 | |
175.60
|
4149.40
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/20/2019 | |
167.60
|
4157.40
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/20/2018 | |
172.90
|
4152.10
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/21/2017 | |
179.80
|
4145.20
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/31/2016 | |
174.00
|
4151.00
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/3/2015 | |
173.30
|
4151.70
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
8/16/1976 | |
160.00
|
4165.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|