3/14/2023 | |
83.00
|
90.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
6/16/2021 | |
82.75
|
90.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
2/21/2020 | |
80.75
|
92.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/21/2019 | |
81.75
|
91.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/28/2017 | |
79.75
|
93.25
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.25 |
3/24/2016 | |
83.50
|
89.50
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/17/2015 | |
83.75
|
89.25
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.25 |
3/7/2013 | |
82.58
|
90.42
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
5/15/2012 | |
80.00
|
93.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|