| 3/30/2025 |   | 
                    29.75
             | 
                         4112.54
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.25 | 
			 
				| 3/29/2024 |   | 
                    26.42
             | 
                         4115.87
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.25 | 
			 
				| 3/20/2023 |   | 
                    37.26
             | 
                         4105.03
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.25 | 
			 
				| 3/30/2022 |   | 
                    35.75
             | 
                         4106.54
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.25 | 
			 
				| 3/30/2020 |   | 
                    28.78
             | 
                         4113.51
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.25 | 
			 
				| 3/29/2019 |   | 
                    32.86
             | 
                         4109.43
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.20 | 
			 
				| 3/23/2018 |   | 
                    30.70
             | 
                         4111.59
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.20 | 
			 
				| 3/28/2017 |   | 
                    32.04
             | 
                         4110.25
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.20 | 
			 
				| 3/29/2016 |   | 
                    35.33
             | 
                         4106.96
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/23/2015 |   | 
                    28.61
             | 
                         4113.68
                    | 
                PROFESSIONAL ENGINEER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.20 | 
			 
				| 3/22/2014 |   | 
                    32.17
             | 
                         4110.12
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/23/2013 |   | 
                    32.00
             | 
                         4110.29
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
		 
	 
    
         
 
    
    
    
    
        
            
        | 
         
         
     
     |