| 3/12/2026 | |
47.05
|
4068.14
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/24/2025 | |
49.95
|
4065.24
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/1/2024 | |
22.00
|
4093.19
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/27/2023 | |
49.10
|
4066.09
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/11/2022 | |
49.60
|
4065.59
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/12/2021 | |
47.70
|
4067.49
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/26/2020 | |
35.90
|
4079.29
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/18/2019 | |
35.50
|
4079.69
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/24/2018 | |
33.70
|
4081.49
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/28/2017 | |
33.10
|
4082.09
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/10/2016 | |
35.10
|
4080.09
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 5/1/1978 | |
8.00
|
4107.19
|
DRILLER
|
WELL LOG
| REPORTED | STATIC | |
|
|