4/5/2024 | |
63.00
|
2483.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
3/22/2021 | |
58.00
|
2488.00
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
3/31/2020 | |
56.40
|
2489.60
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
3/31/2019 | |
58.47
|
2487.53
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.83 |
3/28/2019 | |
56.00
|
2490.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
3/27/2018 | |
58.30
|
2487.70
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
3/20/2018 | |
53.50
|
2492.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
8/6/2014 | |
55.00
|
2491.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|