3/13/2024 | |
40.80
|
1359.73
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
4/4/2022 | |
41.60
|
1358.93
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | |
3/10/2021 | |
40.50
|
1360.03
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
2/24/2020 | |
37.50
|
1363.03
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/4/2019 | |
36.67
|
1363.86
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/2/2018 | |
36.30
|
1364.23
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/1/2017 | |
34.40
|
1366.13
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
2/25/2016 | |
37.50
|
1363.03
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
7/31/2014 | |
49.57
|
1350.96
|
OWRD
|
GWATER
| ETAPE | PUMPING | |
3/4/2014 | |
36.67
|
1363.86
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
11/9/1976 | |
32.00
|
1368.53
|
DRILLER
|
WELL LOG
| REPORTED | STATIC | |
|
|