| 3/12/2026 | |
25.25
|
4093.56
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/20/2025 | |
27.51
|
4091.30
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/14/2024 | |
27.50
|
4091.31
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| UNKNOWN | STATIC | |
| 3/5/2022 | |
25.94
|
4092.87
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| UNKNOWN | STATIC | 1.16 |
| 3/18/2021 | |
24.54
|
4094.27
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.16 |
| 3/28/2020 | |
24.00
|
4094.81
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/8/2018 | |
24.58
|
4094.23
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.67 |
| 3/23/2016 | |
23.33
|
4095.48
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.84 |
| 3/24/2015 | |
25.00
|
4093.81
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/20/2014 | |
20.00
|
4098.81
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 4/19/2009 | |
21.00
|
4097.81
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 7/28/1993 | |
25.00
|
4093.81
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|