| 3/12/2026 | |
236.00
|
44.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/7/2025 | |
234.40
|
45.60
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/15/2023 | |
235.20
|
44.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 4/15/2022 | |
236.50
|
43.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/8/2021 | |
236.00
|
44.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 2/26/2020 | |
236.00
|
44.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/5/2019 | |
235.00
|
45.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/9/2018 | |
232.00
|
48.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 5/9/2013 | |
237.00
|
43.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|