| 3/10/2025 | |
126.40
|
2323.60
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.30 |
| 4/21/2023 | |
|
|
CWRE
|
PERMIT CONDITION PROGRAM
| NOT MEASURED | PUMPING | |
| 3/11/2022 | |
120.80
|
2329.20
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.30 |
| 3/19/2020 | |
123.30
|
2326.70
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.30 |
| 3/14/2019 | |
122.30
|
2327.70
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.30 |
| 3/7/2017 | |
122.30
|
2327.70
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.30 |
| 3/15/2016 | |
123.15
|
2326.85
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.85 |
| 11/4/2015 | 11:46:00 |
121.31
|
2328.69
|
OWRD
|
GWATER
| ETAPE | STATIC | 2.70 |
| 6/15/2015 | |
126.00
|
2324.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|