| 3/4/2026 | |
27.55
|
4096.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/4/2025 | |
29.05
|
4094.75
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/10/2024 | |
29.97
|
4093.83
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
| 3/17/2023 | |
29.57
|
4094.23
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
| 3/15/2022 | |
28.77
|
4095.03
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
| 3/18/2021 | |
27.07
|
4096.73
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
| 3/23/2020 | |
27.60
|
4096.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/14/2019 | |
28.00
|
4095.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/26/2018 | |
26.70
|
4097.10
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/21/2017 | |
26.90
|
4096.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/1/2016 | |
26.70
|
4097.10
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.00 |
| 3/2/2015 | |
24.50
|
4099.30
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 2/17/2014 | |
22.83
|
4100.97
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 2/18/2013 | |
23.00
|
4100.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/1/2012 | |
22.00
|
4101.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/10/2011 | |
24.00
|
4099.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/18/2010 | |
25.50
|
4098.30
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/23/2009 | |
23.80
|
4100.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.40 |
| 8/14/2007 | |
25.50
|
4098.30
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|