| 3/18/2026 | |
44.75
|
4109.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 3/19/2025 | |
44.95
|
4109.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 3/18/2024 | |
45.75
|
4108.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 3/16/2023 | |
47.00
|
4106.95
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.50 |
| 3/26/2022 | |
43.70
|
4110.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 3/26/2021 | |
41.25
|
4112.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 3/26/2020 | |
37.05
|
4116.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 3/26/2019 | |
37.05
|
4116.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 3/26/2018 | |
34.75
|
4119.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 3/29/2017 | |
34.64
|
4119.31
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 3/30/2016 | |
34.05
|
4119.90
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.75 |
| 3/30/2015 | |
31.60
|
4122.35
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.45 |
| 4/22/2014 | |
31.00
|
4122.95
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.30 |
| 5/12/2013 | |
70.00
|
4083.95
|
DRILLER
|
WELL LOG
| UNKNOWN | UNKNOWN | |
|
|