| 3/13/2026 | |
11.40
|
4133.60
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/27/2025 | |
13.20
|
4131.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/13/2024 | |
13.00
|
4132.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/24/2023 | |
16.20
|
4128.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/15/2022 | |
16.00
|
4129.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| UNKNOWN | STATIC | 1.00 |
| 3/26/2021 | |
14.30
|
4130.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/16/2020 | |
14.10
|
4130.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/17/2016 | |
12.80
|
4132.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/13/2014 | |
20.60
|
4124.40
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 7/15/2013 | |
45.00
|
4100.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
| 7/13/2013 | |
45.00
|
4100.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
| 5/15/1978 | |
12.00
|
4133.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|