| 3/2/2026 | |
21.00
|
4168.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/27/2025 | |
21.25
|
4167.75
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/22/2024 | |
20.80
|
4168.20
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.08 |
| 3/24/2023 | |
21.20
|
4167.80
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.10 |
| 3/14/2022 | |
23.10
|
4165.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| SONIC | STATIC | 2.10 |
| 3/19/2021 | |
20.75
|
4168.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| SONIC | STATIC | 2.42 |
| 3/6/2020 | |
18.79
|
4170.21
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| OTHER | STATIC | 2.50 |
| 4/5/2019 | |
18.50
|
4170.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| OTHER | STATIC | 2.00 |
| 3/7/2018 | |
18.83
|
4170.17
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| OTHER | STATIC | 1.50 |
| 3/3/2017 | |
18.33
|
4170.67
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| OTHER | STATIC | 1.50 |
| 2/25/2016 | |
16.35
|
4172.65
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| SONIC | STATIC | 1.50 |
| 3/3/2015 | |
14.98
|
4174.02
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| SONIC | STATIC | 1.50 |
| 1/24/2015 | |
34.50
|
4154.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| SONIC | STATIC | 1.50 |
| 1/13/2015 | |
36.00
|
4153.00
|
DRILLER
|
WELL LOG
| UNKNOWN | UNKNOWN | |
|
|