| 3/18/2026 | |
113.25
|
4446.75
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/3/2025 | |
111.75
|
4448.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/22/2024 | |
110.25
|
4449.75
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/13/2023 | |
109.65
|
4450.35
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/23/2022 | |
108.65
|
4451.35
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/15/2021 | |
107.65
|
4452.35
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/23/2020 | |
106.45
|
4453.55
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 3/21/2019 | |
106.55
|
4453.45
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
| 2/7/2001 | |
97.65
|
4462.35
|
DRILLER
|
WELL LOG
| UNKNOWN | UNKNOWN | |
|
|