3/16/2024 | |
140.15
|
4141.85
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/31/2023 | |
138.55
|
4143.45
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/21/2022 | |
138.35
|
4143.65
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/26/2021 | |
138.25
|
4143.75
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/30/2020 | |
138.15
|
4143.85
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/18/2019 | |
136.75
|
4145.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
3/28/2017 | |
137.24
|
4144.76
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.66 |
3/16/2016 | |
136.95
|
4145.05
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
6/25/2014 | |
147.00
|
4135.00
|
DRILLER
|
WELL LOG
| REPORTED | STATIC | |
|
|