| 3/16/2026 | |
109.49
|
102.51
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/18/2025 | |
109.71
|
102.29
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/15/2024 | |
110.50
|
101.50
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/13/2023 | |
109.38
|
102.62
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/21/2022 | |
112.21
|
99.79
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/15/2021 | |
110.58
|
101.42
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/9/2020 | |
111.08
|
100.92
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/19/2019 | |
110.88
|
101.12
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/5/2018 | |
109.50
|
102.50
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/7/2017 | |
105.00
|
107.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/14/2016 | |
108.33
|
103.67
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/16/2015 | |
107.50
|
104.50
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/11/2014 | |
105.75
|
106.25
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/13/2013 | |
106.45
|
105.55
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 3/7/2012 | |
106.20
|
105.80
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 4/4/2011 | |
106.05
|
105.95
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 5/10/2010 | |
107.50
|
104.50
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|