| 3/18/2024 | |
76.50
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/16/2023 | |
77.00
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/10/2022 | |
77.30
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| UNKNOWN | STATIC | 3.00 |
| 3/26/2021 | |
77.30
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/26/2020 | |
76.70
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 4/22/2018 | |
75.50
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 4/6/2017 | |
75.90
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 7/1/2016 | |
77.00
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 2/20/2015 | |
75.20
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/22/2014 | |
54.30
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/20/2013 | |
51.00
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/19/2012 | |
53.75
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/25/2011 | |
65.25
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 4/27/2010 | |
75.50
|
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 9/18/2007 | |
66.00
|
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|