| 3/4/2026 | |
247.80
|
921.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/4/2025 | |
249.00
|
920.00
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | 2.00 |
| 3/13/2024 | |
248.60
|
920.40
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 8/17/2023 | |
250.25
|
918.75
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.75 |
| 3/4/2021 | |
230.00
|
939.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 2/26/2020 | |
250.00
|
919.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/27/2019 | |
250.00
|
919.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/1/2018 | |
250.00
|
919.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 2/23/2017 | |
250.00
|
919.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 5/27/2016 | |
250.00
|
919.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 2/20/2013 | |
110.00
|
1059.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 2/21/2012 | |
248.00
|
921.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | |
| 3/3/2011 | |
100.50
|
1068.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
| 10/11/1984 | |
243.00
|
926.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|