3/1/2023 | |
15.20
|
184.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/16/2021 | |
15.83
|
184.17
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/19/2019 | |
16.17
|
183.83
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/5/2018 | |
16.17
|
183.83
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
2/28/2017 | |
16.00
|
184.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|