| 3/16/2026 | |
47.50
|
4079.83
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/21/2025 | |
51.10
|
4076.23
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.00 |
| 3/21/2024 | |
50.40
|
4076.93
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.00 |
| 3/31/2023 | |
51.70
|
4075.63
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/20/2022 | |
49.80
|
4077.53
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| UNKNOWN | STATIC | |
| 3/31/2021 | |
49.17
|
4078.16
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.91 |
| 9/10/2015 | |
58.00
|
4069.33
|
DRILLER
|
WELL LOG
| UNKNOWN | UNKNOWN | |
|
|