| 3/18/2026 | |
52.90
|
4106.05
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.80 |
| 3/19/2025 | |
53.00
|
4105.95
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.80 |
| 3/18/2024 | |
51.80
|
4107.15
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.80 |
| 3/26/2022 | |
50.60
|
4108.35
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.80 |
| 3/26/2021 | |
50.51
|
4108.44
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.79 |
| 3/26/2020 | |
48.61
|
4110.34
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.79 |
| 3/26/2019 | |
47.46
|
4111.49
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.79 |
| 3/26/2018 | |
40.71
|
4118.24
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.79 |
| 3/29/2017 | |
40.58
|
4118.37
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.79 |
| 6/14/2016 | |
96.00
|
4062.95
|
DRILLER
|
WELL LOG
| UNKNOWN | UNKNOWN | |
|
|