| 3/25/2026 | |
102.90
|
4480.10
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/4/2025 | |
103.40
|
4479.60
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/21/2024 | |
101.30
|
4481.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/17/2023 | |
102.00
|
4481.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/18/2022 | |
100.80
|
4482.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/16/2022 | |
100.20
|
4482.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/23/2020 | |
101.10
|
4481.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 5/24/2014 | |
96.00
|
4487.00
|
DRILLER
|
WELL LOG
| UNKNOWN | UNKNOWN | |
|
|