| 3/18/2026 | |
45.20
|
4066.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/18/2025 | |
45.10
|
4066.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/23/2024 | |
46.00
|
4066.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/24/2023 | |
43.00
|
4069.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/17/2022 | |
42.50
|
4069.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/18/2021 | |
41.20
|
4070.80
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/10/2020 | |
38.00
|
4074.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.90 |
| 3/25/2018 | |
34.84
|
4077.16
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.16 |
| 3/30/2017 | |
34.33
|
4077.67
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| UNKNOWN | STATIC | 1.17 |
| 3/28/2016 | |
34.84
|
4077.16
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.16 |
| 6/10/2010 | |
21.00
|
4091.00
|
DRILLER
|
WELL LOG
| UNKNOWN | STATIC | |
|
|