| 3/23/2026 | |
32.40
|
4098.61
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/4/2025 | |
34.30
|
4096.71
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/10/2024 | |
35.00
|
4096.01
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/17/2023 | |
34.80
|
4096.21
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/10/2022 | |
34.10
|
4096.91
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/18/2021 | |
32.20
|
4098.81
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/23/2020 | |
30.70
|
4100.31
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/14/2019 | |
33.34
|
4097.67
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.16 |
| 3/26/2018 | |
32.04
|
4098.97
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.16 |
| 3/10/2017 | |
33.54
|
4097.47
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.16 |
| 3/22/2016 | |
32.04
|
4098.97
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.16 |
| 3/1/2016 | |
32.05
|
4098.96
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
| 3/2/2015 | |
30.25
|
4100.76
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
| 2/17/2014 | |
29.65
|
4101.36
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.25 |
| 4/23/2012 | |
26.00
|
4105.01
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|