4/12/2024 | 11:20:00 |
315.75
|
2924.25
|
OWRD
|
GWATER
| ETAPE | STATIC | 1.37 |
1/31/2024 | 10:05:00 |
315.31
|
2924.69
|
OWRD
|
GWATER
| ETAPE | STATIC | 1.37 |
11/3/2023 | 09:30:00 |
|
|
OWRD
|
GWATER
| NOT MEASURED | UNKNOWN | |
7/18/2023 | 15:50:00 |
315.73
|
2924.27
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.37 |
4/17/2023 | 14:40:00 |
328.82
|
2911.18
|
OWRD
|
GWATER
| ETAPE | PUMPING | 1.37 |
1/26/2023 | 11:15:00 |
312.24
|
2927.76
|
OWRD
|
GWATER
| ETAPE | STATIC | 1.37 |
10/4/2022 | 10:55:00 |
311.25
|
2928.75
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.37 |
7/12/2022 | 08:45:00 |
311.51
|
2928.49
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.37 |
4/25/2022 | 13:30:00 |
309.75
|
2930.25
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.05 |
10/5/2021 | 14:20:00 |
307.42
|
2932.58
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.05 |
7/7/2021 | 11:50:00 |
306.65
|
2933.35
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.05 |
4/14/2021 | 13:20:00 |
305.35
|
2934.65
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.05 |
12/18/2020 | 11:58:00 |
303.27
|
2936.73
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.05 |
12/18/2020 | 09:37:00 |
303.31
|
2936.69
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.05 |
10/27/2020 | 11:59:00 |
302.71
|
2937.29
|
OWRD
|
GWATER
| ETAPE CALIBRATED | FALLING | 1.05 |
10/1/2020 | 13:20:00 |
302.78
|
2937.22
|
OWRD
|
GWATER
| ETAPE | STATIC | 1.05 |
9/28/2020 | 11:31:00 |
302.99
|
2937.01
|
OWRD
|
GWATER
| ETAPE | STATIC | 1.05 |
7/7/2020 | 12:08:00 |
306.61
|
2933.39
|
OWRD
|
GWATER
| ETAPE | UNKNOWN | 0.80 |
5/31/1985 | |
282.00
|
2958.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|