| 3/4/2026 | |
52.20
|
4096.27
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/17/2025 | |
53.00
|
4095.47
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/22/2024 | |
53.90
|
4094.57
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/29/2023 | |
53.50
|
4094.97
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/20/2022 | |
54.20
|
4094.27
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| UNKNOWN | STATIC | |
| 3/12/2021 | |
55.33
|
4093.14
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.42 |
| 3/11/2020 | |
51.75
|
4096.72
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.92 |
| 3/21/2019 | |
53.25
|
4095.22
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.08 |
| 5/5/2016 | |
53.00
|
4095.47
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|