| 3/13/2026 | |
6.95
|
200.05
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.60 |
| 3/31/2025 | |
5.70
|
201.30
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.60 |
| 3/8/2024 | |
5.70
|
201.30
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.60 |
| 3/14/2023 | |
6.00
|
201.00
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.60 |
| 5/4/2017 | |
7.17
|
199.83
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.83 |
| 10/3/2012 | |
9.00
|
198.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|