3/6/2024 | |
26.30
|
4144.32
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/24/2023 | |
28.80
|
4141.82
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/4/2022 | |
28.70
|
4141.92
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/26/2021 | |
46.50
|
4124.12
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/27/2020 | |
44.20
|
4126.42
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
5/24/2013 | |
44.00
|
4126.62
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|