| 3/12/2025 | |
11.50
|
975.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 2/19/2024 | |
13.30
|
973.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.20 |
| 3/27/2023 | |
13.80
|
973.20
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.20 |
| 3/4/2021 | |
15.00
|
972.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.20 |
| 11/9/2016 | |
23.49
|
963.51
|
OWRD
|
WELL INSPECTION
| ETAPE | STATIC | 1.93 |
| 11/9/2016 | |
23.00
|
964.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|