3/18/2025 | |
-1.57
|
1411.57
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.67 |
3/26/2024 | |
-3.00
|
1413.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/26/2024 | |
-3.00
|
1413.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/29/2023 | |
-1.67
|
1411.67
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.67 |
3/22/2021 | |
-1.67
|
1411.67
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.67 |
3/31/2020 | |
-1.50
|
1411.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
10/26/2006 | |
24.00
|
1386.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|