| 3/25/2026 | |
37.30
|
4096.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/4/2025 | |
38.35
|
4095.65
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/21/2024 | |
39.10
|
4094.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/18/2022 | |
37.30
|
4096.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/19/2021 | |
35.30
|
4098.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/27/2020 | |
35.60
|
4098.40
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 7/19/2019 | |
45.00
|
4089.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|