3/19/2024 | |
76.07
|
2787.93
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| TRANSDUCER | PUMPING | 5.83 |
3/20/2023 | |
30.63
|
2833.37
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | 5.92 |
4/7/2022 | |
22.83
|
2841.17
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 5.92 |
3/31/2021 | |
1.10
|
2862.90
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 5.90 |
4/6/2020 | |
|
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| NOT MEASURED | UNKNOWN | |
7/22/2019 | |
5.00
|
2859.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|