| 3/31/2025 | |
|
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| NOT MEASURED | UNKNOWN | |
| 3/19/2024 | |
68.95
|
2795.05
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| TRANSDUCER | PUMPING | 6.42 |
| 3/20/2023 | |
32.49
|
2831.51
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | |
| 3/31/2022 | |
23.63
|
2840.37
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 6.42 |
| 3/31/2021 | |
0.50
|
2863.50
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 6.92 |
| 4/6/2020 | |
|
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| NOT MEASURED | DRY | |
| 8/16/2019 | |
10.00
|
2854.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|