3/19/2024 | |
5.00
|
547.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/16/2023 | |
7.50
|
544.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/3/2021 | |
7.09
|
544.91
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.33 |
4/2/2020 | |
9.28
|
542.72
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.22 |
4/3/2019 | |
7.92
|
544.08
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.08 |
4/3/2018 | |
7.50
|
544.50
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
4/14/2017 | |
7.29
|
544.71
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
4/4/2016 | |
7.15
|
544.85
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/10/2015 | |
9.00
|
543.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/31/2014 | |
5.30
|
546.70
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/11/2013 | |
8.19
|
543.81
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | |
5/17/2012 | |
8.30
|
543.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/28/2011 | |
6.70
|
545.30
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.40 |
10/22/2010 | |
8.51
|
543.49
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.25 |
|
|