3/4/2024 | |
57.75
|
153.25
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
2/16/2023 | |
56.92
|
154.08
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/1/2021 | |
56.33
|
154.67
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/2/2020 | |
58.25
|
152.75
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/1/2019 | |
58.25
|
152.75
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/1/2018 | |
56.25
|
154.75
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/1/2017 | |
55.92
|
155.08
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/1/2016 | |
57.08
|
153.92
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/10/2015 | |
56.08
|
154.92
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
2/27/2014 | |
55.67
|
155.33
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
2/27/2013 | |
55.92
|
155.08
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
2/25/2012 | |
55.60
|
155.40
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/15/2011 | |
56.33
|
154.67
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/25/2010 | |
57.92
|
153.08
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/27/2009 | |
58.50
|
152.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/27/2008 | |
57.17
|
153.83
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/22/2007 | |
56.92
|
154.08
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/13/2006 | |
55.75
|
155.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.00 |
3/9/2005 | |
58.50
|
152.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
2/24/2004 | |
57.50
|
153.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
|
|