| 3/20/2025 |   | 
                    142.72
             | 
                         108.28
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/25/2024 |   | 
                    139.35
             | 
                         111.65
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/16/2023 |   | 
                    135.50
             | 
                         115.50
                    | 
                PUMP INSTALLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/23/2022 |   | 
                    145.40
             | 
                         105.60
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/22/2021 |   | 
                    138.69
             | 
                         112.31
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/11/2020 |   | 
                    146.17
             | 
                         104.83
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/20/2019 |   | 
                    145.62
             | 
                         105.38
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/8/2018 |   | 
                    129.00
             | 
                         122.00
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/13/2017 |   | 
                    126.00
             | 
                         125.00
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/15/2016 |   | 
                    133.90
             | 
                         117.10
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/16/2015 |   | 
                    128.40
             | 
                         122.60
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/13/2014 |   | 
                    125.65
             | 
                         125.35
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/18/2013 |   | 
                    121.30
             | 
                         129.70
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/9/2012 |   | 
                    119.00
             | 
                         132.00
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/16/2011 |   | 
                    119.80
             | 
                         131.20
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/17/2010 |   | 
                    126.00
             | 
                         125.00
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/19/2009 |   | 
                    125.20
             | 
                         125.80
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/31/2008 |   | 
                    120.45
             | 
                         130.55
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/23/2007 |   | 
                    120.70
             | 
                         130.30
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
				| 3/24/2006 |   | 
                    111.55
             | 
                         139.45
                    | 
                DRILLER
             | 
                    PERMIT CONDITION PROGRAM
             | ETAPE | STATIC | 1.50 | 
			 
		 
	 
    
         
 
    
    
    
    
        
            
        | 
         
         
     
     |