| 3/18/2026 | |
85.80
|
4470.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/3/2025 | |
85.70
|
4470.30
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/22/2024 | |
85.50
|
4470.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/13/2023 | |
84.30
|
4471.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/23/2022 | |
83.80
|
4472.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/15/2021 | |
83.00
|
4473.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/23/2020 | |
82.10
|
4473.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.70 |
| 3/21/2019 | |
81.80
|
4474.20
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/26/2018 | |
81.70
|
4474.30
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/23/2017 | |
80.10
|
4475.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/18/2016 | |
80.10
|
4475.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/30/2015 | |
86.90
|
4469.10
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/15/2014 | |
79.50
|
4476.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/21/2013 | |
76.50
|
4479.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
| 3/24/2010 | |
95.08
|
4460.92
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.00 |
| 3/25/2009 | |
94.30
|
4461.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
| 3/28/2003 | |
78.00
|
4478.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
|
|