3/19/2024 | |
50.40
|
949.60
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/14/2023 | |
53.30
|
946.70
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.30 |
3/19/2020 | |
113.90
|
886.10
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/29/2018 | |
111.90
|
888.10
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/23/2017 | |
110.90
|
889.10
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/7/2014 | |
118.38
|
881.62
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/14/2012 | |
116.39
|
883.61
|
CWRE
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/25/2011 | |
115.42
|
884.58
|
REGISTERED GEOLOGIST
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/18/2010 | |
134.50
|
865.50
|
REGISTERED GEOLOGIST
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/30/2009 | |
165.14
|
834.86
|
REGISTERED GEOLOGIST
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/21/2008 | |
115.83
|
884.17
|
REGISTERED GEOLOGIST
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/30/2007 | |
125.15
|
874.85
|
REGISTERED GEOLOGIST
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.10 |
3/17/2006 | |
155.94
|
844.06
|
REGISTERED GEOLOGIST
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/29/2005 | |
123.39
|
876.61
|
REGISTERED GEOLOGIST
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/12/2004 | |
126.19
|
873.81
|
REGISTERED GEOLOGIST
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
10/13/1995 | |
125.50
|
874.50
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|