3/25/2024 | |
58.07
|
381.93
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
3/16/2023 | |
56.81
|
383.19
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
3/23/2022 | |
57.05
|
382.95
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
3/26/2021 | |
56.78
|
383.22
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
3/13/2020 | |
56.75
|
383.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
3/20/2019 | |
56.75
|
383.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.66 |
3/19/2018 | |
53.50
|
386.50
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.00 |
3/13/2017 | |
55.00
|
385.00
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.75 |
3/20/2016 | |
53.50
|
386.50
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
2/15/2015 | |
55.00
|
385.00
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/19/2014 | |
54.10
|
385.90
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/1/2013 | |
53.30
|
386.70
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/25/2012 | |
53.00
|
387.00
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/24/2011 | |
53.50
|
386.50
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.00 |
3/17/2010 | |
53.60
|
386.40
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/17/2009 | |
53.00
|
387.00
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/28/2008 | |
52.50
|
387.50
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/18/2007 | |
52.75
|
387.25
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/10/2006 | |
51.75
|
388.25
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/8/2005 | |
51.50
|
388.50
|
OWNER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
|
|