3/17/2006 | |
101.50
|
190.50
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/18/2005 | |
104.66
|
187.34
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
5/7/2004 | |
104.74
|
187.26
|
PROFESSIONAL ENGINEER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
1/7/2003 | |
108.57
|
183.43
|
CONSULTANT
|
PUMP TEST PROGRAM
| ETAPE | STATIC | |
3/20/1990 | |
94.00
|
198.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|