3/21/2025 | |
129.55
|
415.45
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/25/2024 | |
129.05
|
415.95
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/16/2023 | |
128.22
|
416.78
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/16/2023 | |
128.22
|
416.78
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/23/2022 | |
130.68
|
414.32
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/23/2022 | |
130.68
|
414.32
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/22/2021 | |
126.40
|
418.60
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/13/2020 | |
128.42
|
416.58
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/19/2019 | |
129.80
|
415.20
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/8/2018 | |
126.08
|
418.92
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/14/2017 | |
122.50
|
422.50
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/14/2016 | |
127.40
|
417.60
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/16/2015 | |
125.50
|
419.50
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/13/2014 | |
125.95
|
419.05
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/14/2013 | |
127.70
|
417.30
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/8/2012 | |
127.00
|
418.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/30/2011 | |
125.40
|
419.60
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/18/2010 | |
127.67
|
417.33
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.08 |
3/12/2009 | |
127.42
|
417.58
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.08 |
3/24/2008 | |
127.23
|
417.77
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.08 |
|
|