3/31/2008 | |
10.00
|
740.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/21/2007 | |
10.00
|
740.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
4/28/2006 | |
8.50
|
741.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
4/15/2004 | |
5.50
|
744.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/11/2003 | |
-4.50
|
754.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| PRESSURE GAGE | STATIC | 1.50 |
2/26/2001 | |
-9.35
|
759.35
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/16/2000 | |
-10.90
|
760.90
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.66 |
10/8/1996 | |
1.00
|
749.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|