3/29/2024 | |
167.67
|
372.33
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | RISING | 0.50 |
3/30/2023 | |
107.00
|
433.00
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/29/2022 | |
105.20
|
434.80
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.60 |
3/23/2021 | |
105.50
|
434.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/30/2020 | |
109.75
|
430.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/27/2019 | |
102.92
|
437.08
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/29/2018 | |
103.83
|
436.17
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/31/2017 | |
96.00
|
444.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.50 |
3/30/2016 | |
96.83
|
443.17
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.67 |
3/28/2014 | |
96.83
|
443.17
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 0.67 |
3/30/2011 | 09:25:00 |
101.25
|
438.75
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 0.80 |
11/10/2010 | 12:12:00 |
111.84
|
428.16
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 0.80 |
3/10/2010 | 13:57:00 |
106.58
|
433.42
|
OWRD
|
GWATER
| ETAPE | STATIC | 0.80 |
10/8/2009 | 08:45:00 |
115.26
|
424.74
|
OWRD
|
GWATER
| ETAPE | STATIC | 0.80 |
3/24/2009 | 08:41:00 |
104.29
|
435.71
|
OWRD
|
GWATER
| ETAPE | STATIC | 0.80 |
3/17/2009 | |
103.17
|
436.83
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/20/2008 | 08:43:00 |
104.63
|
435.37
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 0.80 |
2/1/2008 | 09:15:00 |
101.13
|
438.87
|
OWRD
|
GWATER
| ETAPE | STATIC | 0.80 |
3/17/2004 | |
107.00
|
433.00
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | |
7/26/1999 | 11:49:00 |
74.20
|
465.80
|
PUMP INSTALLER
|
PUMP TEST PROGRAM
| REPORTED | STATIC | 0.80 |
|
|